Capability
Line transfer (RGV)
Rail vehicles, conveyors, and buffers that move work between stations without adding people at the handoff.

Pain points
- Stations run at different rhythms; handoffs create waiting or pile-ups
- Manual cart or forklift transfer between thermal / process sections
- Standalone conveyors ignore upstream and downstream cycle
- Buffer size guessed, not sized to the real line
What we deliver
- RGV / rail transfer docked to existing stations
- Conveyors and buffers planned with upstream and downstream cycle
- Transfer in and out of process sections (e.g. kiln / thermal) as a line section
Boundary: We scope transfer and buffering for the defined path. Building layout changes, kiln OEM control, and full plant logistics fleets are out of scope unless contracted.